Basic Teamcenter Functionality Test
Please do the test and will publish your name with the score in the comment section.
Candidate Name:………………………………………………………………….
Date: ……………………
Score:-
Teamcenter Interview Question with Multiple Answer
Kindly give the answer to the below question in the comment box. our team will respond your answer is correct or incorrect. Please do the test and check your knowlegde.
1) Relation of UG Part(2D)
(a) Specification (b) Manifestation
(c) Reference (d) Rendering
2)Minimum status which we can assign an Item Revision is
(a) X (b) BL
(c) PP1 (d) Job1
3) Why are Items used in TC?
(a) To manage Information in TC (b) To manage PDM data in TC
(c) To migrate PLM and PDM (d) Both (a) & (b)
4) Item ID should have
(a) Not more than three Items should have the same ID (b) Unique ID
(c) Two Items can have the same ID (d) Both (a) & (c)
5) Generally Items are created in the below Application?
(a) Teamcenter Unified (b)Teamcenter Visualization
(c) Active Workspace (d) Both (a) & (c)
6) Direct Model dataset represents
(a) 2D Image (b) Attributes
(c) 3D Image (d) Both (b) & (d)
7) cgm, pdf represents
(a) 2D Image (b) Attributes
(c) 3D Image (d) Both (b) & (d)
8) Every Item has at least
(a) 1 Item Revision (b) 2 Item Revision
(c) 0 Item Revision (d) 3 Item Revision
9) Implicit check-out is performed by
(a) User (b) Happens Automatically
(c) 3-party user (d) Both (a) & (c)
10) Explicit check-out is performed by
(a) User (b) Happens Automatically
(c) 3-party user (d) Both (a) & (c)
11) When a dataset is in check-out condition, means
(a) User can modify (b) User cannot modify
(c) User can freeze (d) Both (a) & (c)
12)Teamcenter does not support of below model architecture
(a) 2-Tier (b) 4-Tier
(c) 3-Tier (d) All Tier supported
13) When an Item Revision is in freeze condition
(a) User can modify (b) User cannot modify
(c) User can freeze again (d) Both (b) & (c)
14)Which version of Active workspace, Microservices concept is introduced?
(a) AWC 4.1 (b) AWC 4.2
(c) AWC 4.3 (d) AWC 5.0
15)PLM stands
(a) Product Long Management (b) Product Lifecycle Management
(c) Public Lifecycle Management (d) Product Lifecycle Model
16)TCUA Stands for
(a) Teamcenter Uniform Architecture (b) Teamcenter Unified Architecture
(c) Teamcenter Unicorn Architecture (d) Teamcenter Union Architecture
17) Dataset “Catia Product” must be used for
(a) Part (b) Drawing
(c) Assembly (d) None of these
18)Thin client concept is removed after which version of removed of Teamcenter?
(a) TC11 (b) TC12
(c) TC10 (d) TC13
19) No. of occurrences in Structure Manager corresponds to
(a) number of times the component is used in the BOM
(b) quantity within each specified occurrence
(c) number of times the component is not used in the BOM
(d) both (a) & (b)
20) Structure Manager is used for
(a) Viewing Part Structure (b) Viewing Form Structure
(c) Viewing Assembly structure (d) Viewing Item Structure
21) Changes made in Structure Manager are saved in
(a) Item Revision Master Form (b) Item Master Form
(c) BOM View Revision (d) BOM View Form
22) Inbox in TC allows you to
(a) Tasks to Perform (b) Tasks to Track
(c) Tasks to View (d) Both (a) & (b)
23)TCRA stands for
(a) Teamcenter Rate Analystics (b) Teamcenter Report Analog
(c) Teamcenter Report Analystics (d) Teamcenter Report Architecture
23) User Inbox in Teamcenter is available at
(a) Home (b) My Work list
(c) Workflow Viewer (d) PSE
24) TC Visualization is used to view
(a) CGM (b) JT
(c) Form Attributes (d) Both (a) & (b)
25) Specify whether 2D (or) 3D
(i) UG Master ……………….
(ii) Catia Part ………………..
(iii) Ideas Part ……………….
(iv) UG Part ………………..
(v) Ideas Drawing ………………..
(vi) Catia Drawing ……………….
26)How we can revise item revision
-
- File – > Revise
- Ideas -> Revise
- File-> New -> Revise
- Ideas -> File -> New -> Revise
27)Items with BOM have JT in TC Unified?
(a) True
(b) False
28)How to open Catia dataset in Catia Manager?
1)File->New-> Open Catia
2)Catia-> Load in Catia
3)File-> Load in Catia
4)Catia-> Open Catia
29) Shortcut key for creating New Temp Item in TC Engineering is
1.Ctrl+D
2.Ctrl+T
3.Ctrl+I
4.Ctrl+B
30)Shortcut key for creating New Dataset in TC Engineering is
1.Ctrl+D
2.Ctrl+T
3.Ctrl+I
4.Ctrl+B
31)Workflow Viewer is used to
1. View the structure of the Assembly
2. View the progress of any Workflow
3. View 3D Model in workflow
4.Both (b) & (c)
32)How to close Application in TC
1.File-> Exit
2.File-> Close
3.File-> Close All
4.None of these
33)Named Reference is used for
1.Folder
2.Item
3.Item Revision
4.Dataset
34)To view work flow process
1)User must be participating member
2)User may not be participating member
3)No user can view the workflow process
4)None of the above.
35)Owner of the Item can modify the freeze dataset
a)True
b)False
36)Precise Assembly is Fixed
a)True
b)False
37)Imprecise Assembly is Dynamic
a)True
b)False
38)Workflow Viewer is used to
1.View the structure of Assembly
2.View the progress of any Workflow
3.View 3D Model in workflow
4.Both (b) & (c)
39)How to close Application in TC
1.File-> Exit
2.File-> Close
3.File-> Close All
4. None of these
40) Named Reference is used for
(a) Folder (b) Item
(c) Item Revision (d) Dataset
41) To view Workflow Process
(a) User must be participating member (b) User may not be participating member
(c) No user can view the workflow process (d) None of the above
42) Work-in-progress symbol means Item Revision is currently in workflow process
(a) True (b) False
43)Owner of the Item can modify freeze dataset
(a) True (b) False
44)Precise Assembly is fixed
(a) True (b) False
44)Imprecise Assembly is fixed
(a) True (b) False
45)which isn’t the Siemens product?
(a) NX (b) CATIA
(c) Teamcenter (d) AWC
Popular Teamcenter Interview published Post
Four Easy Steps to Get Subscribed
Step1:-Enter your Email address and Hit SUBSCRIBE Button.
Step2:-Please check inbox and open the email with the subject line“Confirm your subscription for Global PLM“.
Step3:-Please click “Confirm Follow” and you got the email with the subject” Confirmed subscription to posts on Global PLM”.
Step4:-Voila, You are subscribed.Happy Learning
We will more post on PLM Interview Question–>Teamcenter Interview in upcoming days.
Kindly provide your valuable comment on the below Comment section and We will try to provide the best workaround.
Kindly subscribe to your Email-Id at (https://globalplm.com/) and drop any suggestions/queries to ([email protected]).